Waati bolodacogo & Takt labɛnni Sɛbɛn: for construction control

Baara waati labɛnni kuntigi sɛbɛnw, birbirila fɛn minɛnw ni kɔlɔsili kɛlenw bɛɛ ka kɛ so kɔnɔ Takt labɛnni yiraw la; o bɛ porozɛ so kɔnɔw, sosiyetew, baarakɛminɛnw ni plan kuntaala ye.

WBS yeKansɛri Jateminɛ kɛcogo
Labɛnnaand Kansɛri Donw
Sowfor takt Baarakɛminɛnw

Waati bolodacogo and takt data in one Porozɛ context

Use the Kansɛri for structured programme sɛbɛnw and the takt board for So kɔnɔ-Nivo production planning.

WBSKansɛri numbering
Kuma surun tasks and Kɔlɔsili kɛlenw
A ɲɛfɛ and A nɔnabila jɛgɛnsira minnu bɛ yen
Labɛnna and Kansɛri Waati bolodacogo mode
So jɔli, Nivo and So kɔnɔ Sataraw
So kɔnɔ Plano Baarakɛyɔrɔ and thumbnails
Kɔmpani color bars
Schedule export controls

Ka bɔ programme Jateminɛ kɛcogo ka So kɔnɔ activity flow

ArchiMeshseparates the Sanfɛ-Nivo Waati bolodacogo ka sɛbɛn Ka bɔ the production planning Jira while keeping both inside Porozɛ controlling.

01

Build the Kansɛri

Kansɛri, Kuma surun and Kansɛri Sataraw withWBSIDs, Kansɛri, Kɔmpani, Baara bolow ka kuluw, Labɛnna Donw, Kansɛri Donw and Ɲɛtaa.

02

Birbirila fɛn minɛnw fara ɲɔgɔn kan

Use predecessor and successor fields and dependency drawing to keep schedule relationships visible on the timeline.

03

Plano takt Baarakɛminɛnw by So kɔnɔ

Use So jɔli, Nivo and So kɔnɔ Sataraw, assigned Planos and Kɔmpani-colored activity bars ka coordinate Zona-based work.

ArchiMeshScheduling andTaktPlanning Lajɛba Ɲɛjirali
Waatibolodacogo views keep Waati bolodacogo sɛbɛnw and takt Baarakɛminɛnw readable for Porozɛ teams.

Sɛbɛn: Scheduling and takt views

Baara waati labɛnni kuntigi, Takt kunnafoniw ni plan kuntaala lajɛ yiraw baara sira kelen kɔnɔ.

Scheduling andTaktPlanning Lajɛba
Lajɛba of Waati bolodacogo and takt planning controls.

Sɛbɛn: Why construction teams use it

The planning tools are useful when the same Porozɛ needs a structured programme and a practical So kɔnɔ-by-So kɔnɔ activity Jira.

Keep structure visible

WBS rows, parent tasks, milestones and dependencies make the master schedule easier to review than a flat list.

Compare Labɛnna and Kansɛri Donw

The Waati bolodacogo Jira supports separate Labɛnna and Kansɛri Don fields without losing the Kansɛri ka sɛbɛn.

Plano by Sow and Sosiyetew

Taktplanning uses Porozɛ Sow and Kɔmpani-colored Baarakɛminɛnw so short-cycle work can be coordinated by Sigiyɔrɔ.

Planning connects ka Ɲɛtaa and Jagokɛyɔrɔ control

Waati bolodacogo and takt data sits near Ɲɛtaa ɲɛnabɔli, notices, Jagokɛyɔrɔ sɛbɛnw and Poroze ɲini.

A bɛ sigi yɔrɔ min na poroze baara sira kɔnɔ

Use Scheduling and Takt Planning when date logic and location-based production planning need to be reviewed together. Master schedule tasks, WBS, dependencies, milestones, planned dates, actual dates, room-based takt activities and plan context help teams connect programme structure with where the work happens.

Plano the Waati bolodacogo and the takt flow Ka bɔ the same Porozɛ platform.

ArchiMeshconnects Porozɛ planning, Ɲɛtaa sɛbɛnw, Jagokɛyɔrɔ control, Sɛbɛnw and Porozɛ-wide Ɲini in one construction management Baarakɛyɔrɔ.

Tɛmɛsira hɔrɔn daminɛ