Commissioning for systems, tests and handover

Track commissioning systems, assets, templates, checklists, tests, line answers, failed items, issues, signatures, sign-offs and turnover package readiness.

Systemsand assets
Testsand checklists
Packagesturnover readiness

Commissioning records connected from system to package

The implemented module covers commissioning systems, assets, templates, template lines, generated records, record lines, issues, responses, attachments, sign-offs and turnover packages.

Commissioning systems
Commissioning assets
Checklist and test templates
Generated records and record lines
Pass, fail, NA and measurement answers
Photo, note and signature line types
Issues from failed lines
Turnover package readiness

From asset setup to handover package

Commissioning is built around the records that handover teams actually manage: systems, assets, checks, issues and package evidence.

01

Structure systems and assets

Create systems and assets with tags, trades, companies, rooms, status, schedules, attachments and conversation.

02

Generate and complete tests

Use templates to create checklist or test records, answer required lines and calculate pass percentage and failed line counts.

03

Resolve and package

Track commissioning issues, capture sign-offs and collect records, issues, documents, media or certificates into turnover packages.

ArchiMesh Commissioning register screenshot
Commissioning connects systems, assets, checklist records, issues and turnover packages.

Commissioning in context

Move from systems and assets to test records, issue follow-up and package readiness without losing handover context.

Commissioning register view
Register system numbers, asset tags, trades, companies, rooms and status.

Why commissioning teams need it

Commissioning data becomes usable when checks, issues, sign-offs and handover packages are connected to the same systems and assets.

Trace checks to assets

Checklist and test records can be tied to systems and assets instead of free-floating files.

Capture failure context

Failed lines can create commissioning issues when templates require it.

Prepare handover packages

Package records track items and readiness percentage for turnover review.

Commissioning works with the wider project record

Use this module alongside related ArchiMesh workflows instead of duplicating the same project facts in disconnected tools.

Bring commissioning into the same platform as the project work.

ArchiMesh connects field records, documents, people, safety, commercial workflows, communication and AI support in one construction project management platform.

Start Free Trial